We are pleased to present you the pictures of the assembly of the pilot solar loop at the Themis solar tower. The assembly started in April 2019. More infomation to come soon.

Lifting of the particle dispenser atop the Themis solar tower
The dispenser arrives at the high level floor
The dispenser is placed behind the main door facing the solar field